Installation
We recommend that any on-site facility maintenance, addition, or change be completed before we begin installation or reinstallation—all chamber painting, plastering, lighting, and electrical upgrades should be complete. Your electrician should be brought into the project early on, but during this step, the electrician will be most actively involved.
Installation/re-installation will follow a step-by-step process similar to this:
- Complete chamber prep work
- Unload and stage the instrument
- Install the sub assembly
- Set wind chests, winding, console, and casework
- Install large and small pipe work
- Adjust winding and mechanical actions
- Perform rough tuning
- Perform voicing
- Perform fine tuning
Our craftsman will perform all steps up to the last one: fine tuning and tonal finishing. At this point, Patrick and an assistant will check and adjust all mechanical details, and then tune and tonally regulate (finishing) the organ and place his signature of approval on the final product.